top of page
dw-painting_logo Good One.png
Project Showcase

Austin Achieve Phase 1 & 2

Phase 1 of the Austin Achieve School Building project included the construction of a new primary school building on their new campus site. The building is approximately 70,000 sq ft on two floors. The work includes various components for the new building including a steel frame, metal stud walls, brick veneer, roofing, site work, paving and landscaping, and new MEP. The project also includes a new warming kitchen. This project is the first phase of a multi-phase new campus construction plan.

Phase 2 of the Austin Achieve School New Campus project includes construction of a new secondary school building on the campus site. The building is approximately 56,500 sq ft on two floors. The work includes various components for the new building including: steel frame, metal stud walls, brick veneer, roofing, site work, paving and landscaping and MEP systems. In addition to the academic building, the scope includes a sports field and spectator stands positioned in a courtyard between the Primary School (Phase 1) and the Secondary Academic Building.

Contact Us

1405 Arrow Point Dr. Ste.1001

Cedar Park, TX 78613

512.259.1411

Thanks for contacting us - we will be back in touch!

bottom of page